100×200 Steel Building Cost: Options and Estimates

11 min read

Table of contents

Transform your vision into a reality!

Chat with one of our building experts to craft the perfect design to suit your operational needs.

100×200 Steel Building Cost: Options and Estimates

100×200 Steel Building Cost: Options and Estimates 1024 768 Steel Buildings | Allied Steel Buildings

100×200 Steel Building

Steel warehouses offer an inexpensive and efficient option to businesses that require additional storage space. 100×200 metal buildings, in particular, highlight the advantages and versatility of large steel buildings, making them ideal for warehouses and manufacturing facilities. Metal buildings may be designed to meet any specific demands, while also providing plenty of safe, secure storage for brief or long-term use.

Prefab metal buildings offer customization options to meet specific needs and are known for their durability. Metal prefabricated and pre-engineered constructions provide many advantages over other building materials. Nothing else can match their flexibility, speed of construction, reduced maintenance, and insurance costs. When you opt for steel, you save money, get a strong and secure building, and have the most energy-efficient and environmentally friendly material to work with.

 

The Benefits of a Metal Building Warehouse

Steel warehouses are 30% faster to erect and require far less maintenance work each year. As a highly efficient and durable building system, these structures are highly adaptable to many commercial uses. Most distribution centers, fulfillment centers, and warehouse constructions need large open areas, and a clear-span steel warehouse does not need interior support columns.

Exterior of Dy Mark Industries steel building

Steel prefabricated warehouses can accommodate unobstructed interiors of up to 300 feet in width, to allow forklifts and other warehouse equipment to easily navigate all parts of the building. These metal buildings also offer numerous customization possibilities, allowing them to be tailored to meet specific customer needs and enhancing their appeal and functionality.

Certainty

Wood and concrete both lack uniformity in terms of material. The strength of lumber varies significantly from one species to the next. Today’s timber is often derived from smaller, younger trees. Concrete’s strength is influenced by the water-to-cement ratio. Changes in temperature or scheduling issues that can cause cement mixers to halt can further weaken the concrete.

Steel, on the other hand, is subject to strict industry standards. Every type and thickness of steel has a certain known strength and performance. As a result, there is no room for error in steel production. Steel’s consistency and performance are beyond doubt, making steel buildings the superior choice over traditional wooden structures for cost and durability.

Material Savings

Steel buildings and pre-engineered metal buildings are designed for durability and low maintenance, making them an ideal solution for structures like warehouses and manufacturing facilities. Every part of the structure is accounted for before it arrives on your job site. There’s no need to allow for extra materials, as these buildings are complete when they arrive, ready to bolt together.

Lower Cost to Insure

There are several elements to consider when calculating insurance premiums for various structures, but two of the most essential are building components (materials utilized in the frame, interior and exterior walls, both load-bearing and non-load-bearing) and fire resistance (the amount of time a passive fire protection system can withstand flame).

Metal buildings are less expensive to replace than wooden or stone structures, and they have a considerably lower risk of damage from fire.

Lower Maintenance Cost

Steel is resistant to weathering, unlike wood-frame structures. It will not decay or fracture, and it is not susceptible to insect attack. As a result, you won’t have to deal with moisture, track the deterioration process, or protect against pests. The same may be said for the roof: no shingle replacements or plywood decking wrestling is needed. Steel roofing is becoming increasingly popular among commercial and residential builders because it requires significantly less upkeep.

Overhead shot of exterior of pre-fabricated steel building used as a shopping center

Metal structures do not need to be painted regularly. They are factory-finished, so your structure should not require repainting — at least not for 30 to 40 years!

Safety and Codes

Safety is a top priority when it comes to metal buildings. A 100 x 200 metal building must comply with local building codes, regulations, and safety standards to ensure the well-being of occupants and users.

Key safety features to consider in a 100 x 200 metal building include:

  • Primary and Secondary Framing: Ensure that the building’s frame is designed and constructed to withstand various loads, including wind, snow, and seismic activity. Robust framing is essential for the structural integrity of the building.
  • Wall Panels: Select wall panels that meet local building codes and regulations, and are designed to provide adequate insulation, weather-tightness, and structural integrity. Quality wall panels contribute to the overall durability and energy efficiency of the building.
  • Fire Resistance: Ensure that the building’s materials and design meet local fire safety standards and regulations. Fire-resistant materials can significantly reduce the risk of damage and enhance the safety of the building.
  • Accessibility: Ensure that the building is accessible and compliant with the Americans with Disabilities Act (ADA) standards. This includes features such as ramps, wide doorways, and accessible restrooms.

By prioritizing safety and compliance with local building codes, you can ensure a safe and secure 100 x 200 metal building that meets your specific needs.

Take the next step

We have a passion for unconventional solutions that bring your vision to life.

Price Your Building Today

Applications of a 100 x 200 Ft2 Steel Building

These structures, with over 20,000 ft2 of column-free area, are ideal for warehouses, churches, distribution centers, auto repair shops, and other commercial purposes.

Wide shot of pre-fabricated steel structure, with American flag hanging on the ceiling above a red tractor

A shipping firm may find this volume of space adequate for transfer storage between online shops and their clients. Steel structures with multiple levels can be built to maximize the usable area in a tight, but pricey city location, in addition to single-story designs.

How Much Does it Cost to Build a 20,000 Ft2 Steel Building?

When it comes to major construction expenditures, there are various elements that can influence the price. Although material and labor expenses will be split between two projects, differences in design may lead to one design being more or less expensive than others. Another element to consider is whether the structure has more than one level.

The cost of a commercial steel structure per ft2 ranges between $12 and $25. Costs will vary depending on the region and the warehouse size, as well as other factors such as land clearing, distance from utilities, architectural design, and raw material costs.

Hard Costs

All the labor and materials used in the construction of a steel building are included in the hard costs. This covers foundation work, cement, steel, building shell materials, windows, roofing, HVAC systems if needed, as well as interior finishes, if required.

Materials

The costs of materials, as well as the design, function, and site of a steel warehouse, are all factors. Material costs for a 100 x200 ft2 steel warehouse will vary in price from $7 to $11 per ft2.

DISCLAIMER: The drastic fluctuation in construction prices mandate using this information as a general guide. It is important to understand that supply chain issues, material costs, and consumer demand can significantly impact cost estimates.

Labor

The median labor expense is $5–$9 per ft2, or 20% to 40% of the project’s total budget. Labor costs include:

  • Wages
  • Worker’s Compensation
  • Insurance
  • Payroll fraud
  • Paid time off
  • Recruiting and training expenses
  • Equipment: company phones, computers, and vehicles

HVAC Equipment

Rooftop HVAC systems are, like everything else in construction, susceptible to price variation based on the region and building design. The cost of commercial rooftop systems ranges from $20 to $33 per ft2.

Soft Costs

Building soft costs are the indirect expenses of a business, such as labor and supplies, that are not directly related to the construction of a building or project. Non-physical factors include:

  • Inspections
  • Permissions
  • Leasing fees
  • Insurance premiums
  • Administration expenditures

Additional Design Options

Depending on the building’s final use, a steel warehouse design could include various add-ons and design choices.

Four builders in hard hats gathered under the structure of a steel building

Flooring

Concrete Floor Finishes

Concrete is commonly left unfinished, but it doesn’t have to be. Finished concrete floors provide the structural and economic benefits of concrete without sacrificing their beauty. Finished concrete flooring can be glazed, dyed, stained, or etched to create genuinely distinct patterns.

Waterproof Vinyl

Waterproof vinyl tile comes in various styles and patterns, some of which are reminiscent of natural wood and stone. It also has significantly less material and labor needs than other flooring alternatives. Vinyl also has the advantage of not shrinking or swelling as much as some natural products when heated or cooled.

Poured Resin

In the steel construction sector, resin flooring has grown in popularity. The technique works by applying an epoxy resin to a concrete surface, which hardens and forms a solid layer. It’s ideal for commercial and industrial use, since it is long-lasting, simple to maintain, and inexpensive. They’re also smooth, which might be beneficial if the building uses machinery that cannot move over seams.

Ventilation

Even in the coldest climates, every steel structure requires a decent ventilation system. Ventilation is required in the summer heat to maintain a pleasant temperature and provide air circulation, while also removing stale air. Vents are also required in the winter to prevent condensation from gathering on the walls, which can cause damage.

In hot climates, chemical or wet items require more exhaust fans than dry materials. In addition, agricultural metal structures need barn vents to minimize the hazards posed by ammonia and other corrosive airborne pollutants.

Insulation

Insulation is essential for steel buildings. It helps prevent heat transfer throughout the structure, while also lowering condensation formation and noise levels within. Insulation adds stability to interior temperatures, improves comfort, and makes the building more energy-efficient, which allows you to save money on heating and cooling expenses.

Design Your 100 x 200 ft2 Steel Building with Allied Steel Buildings

Allied Steel Buildings Pre-Engineered 20,000 ft2 warehouses are a cost-effective and long-lasting option for retail, e-commerce, and warehouse needs. Our 3D platform can help you design and price your metal warehouse to your exact requirements, including local regulations, as well as all of our pricing options. Contact us today to learn more.

About Allied

Discover the world of steel structure solutions with Allied Steel Buildings - a global leader delivering over 5,500 structures across more than 65 countries. Trusted by clients worldwide, we excel at tackling the most intricate challenges, thanks to our team of skilled professionals and cutting-edge technology. From design to engineering, we set the highest quality standards, ensuring unmatched reliability. Experience the true essence of efficiency, cost-effectiveness, and sustainability with our exceptional prefabricated buildings. Embrace innovation, choose Allied.